The construction phases 2001 – 2003 in images.
- Realisation of the dry dock
- Slipformwork for the tunnel elements
- Concreting of tunnel elements
- Dry dock with tunnel elements
- Access road
- Tunnel entrance East
- Tow out of the elements
- Filled dry dock
- Roofing ceremony administration building
- Bridge BW03
- Toll plaza 2003
- Toll plaza electrical gate
- Toll plaza canopy
- Toll plaza lane
- Overhead gantry sign
- Inside the tunnel
- Emergency exits
- Control centre
- Toll plaza 2003
- Administration building
- Tunnel entrance West
- Tunnel entrance East